20 0121_20 0120_02112021_004105.mp4
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
346.9 ft. - Obstacles Pipe Material, 15 %of cross sectional area, from 09 to 03 o'clock
374 ft. - Obstacles Pipe Material, 15 %of cross sectional area, from 09 to 03 o'clock

375.5 ft. - Survey Abandoned - DUE TO OBSTRUCTION.
| Distance | Code | Observation |
|---|---|---|
| 2 | DAGS | — |
| 177.6 | TFC | — |
| 80.4 | TFC | — |
| 375.5 | SAP | — |
| 76.6 | TFC | — |
| 279 | TFC | — |
| 0 | MWM | — |
| 0 | MWL | — |
| 0 | AMH | 20 0121 |
| 346.9 | OBM | — |
| 375.5 | DAGS | — |
| 2 | SAP | — |
| 367.5 | TFC | — |
| 375.5 | SSS | — |
| 371.3 | TFC | — |
| 2 | SSS | — |
| 375.5 | MSA | DUE TO OBSTRUCTION. |
| 374 | OBM | — |
| 181.6 | TFC | — |
| 283.1 | TFC | — |