Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 10, 2021, 10:14 AM
  • 20 0120_20 0119_02112021_021915.mp4

Date
02/10/2021
W/O
875307
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00744
PipeID
P19043
Time
2:14 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8566
Sewer Name
20 TRUNK "C"
City
PALMDALE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
01
Purpose
Routine Assessment
Project
RFIR_WO_875307_TV20027_FEB2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0120
Downstream MH
20 0119
Dir. of Survey
Downstream
Length Surveyed
37.3 ft.
Total Length
37.3 ft.
Structural Index
3
Structural Quick
3727
Structural Rating
35
O&M Index
2
O&M Quick
3127
O&M Rating
17
Overall Index
2
Overall Quick
Overall Rating
52
Pipe schematic from manhole 20 0120 to 20 0119
MH: 20 0120MH: 20 0119downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 01200 ft. MWM - Water Mark, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start37.1 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - DEBRIS UNDER WATER37.3 ft. MSA - Survey Abandoned - DUE TO DEBRIS.37.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish37.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish37.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  15 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES - DEBRIS UNDER WATER

    37.1 ft. - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - DEBRIS UNDER WATER

  • Survey Abandoned - DUE TO DEBRIS.

    37.3 ft. - Survey Abandoned - DUE TO DEBRIS.

Observations (11)

DistanceCodeObservation
37.3MSADUE TO DEBRIS.
2DAGS
37.3DAGS
37.3SSS
2SSS
37.1DSZDEBRIS UNDER WATER
2SAP
37.3SAP
0MWL
0AMH20 0120
0MWM

Properties (7)

additional_info
630069021021203
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-02-10T02:14:33-08:00
documentation
PRO PIPE
is_lateral_inspection
false