Wastewater/Activity/PacpInspection/1.0Feb 10, 2021, 06:38 AM
  • 20 0119_20 0118_02092021_225123.mp4

Date
02/09/2021
W/O
875307
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00744
PipeID
P19042
Time
10:38 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8562
Sewer Name
20 TRUNK "C"
City
PALMDALE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
01
Purpose
Routine Assessment
Project
RFIR_WO_875307_TV20027_FEB2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
20 0119
Downstream MH
20 0118
Dir. of Survey
Downstream
Length Surveyed
381.2 ft.
Total Length
381.2 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
380
O&M Index
2
O&M Quick
2N00
O&M Rating
152
Overall Index
2
Overall Quick
Overall Rating
532
Pipe schematic from manhole 20 0119 to 20 0118
MH: 20 0119MH: 20 0118downstream0 ft. AMH - Upstream Manhole, Survey Begins - 20 01190 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start116.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"120.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"213.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"218 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"319.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"323.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"379.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish379.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish379.7 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish381.2 ft. AMH - Downstream Manhole, Survey Ends - 20 0118

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
0AMH20 0119
0MWM
319.9TFC
379.7SSS
2SSS
218TFC
2SAP
213.8TFC
2DAGS
116.5TFC
379.7DAGS
381.2AMH20 0118
379.7SAP
323.6TFC
120.5TFC
0MWL

Properties (7)

additional_info
630069020921201
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
3
customer
1
datetime
2021-02-09T22:38:30-08:00
documentation
PRO PIPE
is_lateral_inspection
false