Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 2, 2021, 06:19 AM
  • H 0887_H 0616_03012021_232553.mp4

Date
03/01/2021
W/O
875314
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00191
PipeID
P11035
Time
10:19 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8624
Sewer Name
H JOINT OUTFALL H - UNIT 8H
City
BALDWIN PARK
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
24
Purpose
Routine Assessment
Project
RFIR_WO_875314_TV15237_FEB2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Width
39 in.
Upstream MH
H 0616
Downstream MH
H 0887
Dir. of Survey
Upstream
Length Surveyed
320 ft.
Total Length
320 ft.
Structural Index
4
Structural Quick
5231
Structural Rating
15
O&M Index
3
O&M Quick
3100
O&M Rating
3
Overall Index
4
Overall Quick
Overall Rating
18
Pipe schematic from manhole H 0616 to H 0887
MH: H 0616MH: H 0887upstream0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. MSA - Survey Abandoned - COMPLETED REVERSAL MATCHED FOOTAGE0 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. DSF - Deposits Settled Fine, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish0 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish14.5 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"24.9 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start38.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"51.5 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES60.8 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"84.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"108.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"131.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"154.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"179 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"200.9 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"226.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"249.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"273.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"299.3 ft. DSF - Deposits Settled Fine, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start305.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"317.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start317.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start318 ft. MGO - General Observation - MAG COAT320 ft. AMH - Downstream Manhole, Survey Begins - H 0616320 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK320 ft. MWL - Water Level, 20 %of cross sectional area320 ft. MWM - Water Mark, 35 %of cross sectional area

Observation photos (7)

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Fine,  15 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    20.7 ft. - Deposits Settled Fine, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES

    268.5 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    295.1 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Survey Abandoned - COMPLETED REVERSAL MATCHED FOOTAGE

    320 ft. - Survey Abandoned - COMPLETED REVERSAL MATCHED FOOTAGE

Observations (28)

DistanceCodeObservation
46.3TFC
320SSS
188.4TFC
305.5TFC
235.3TFC
281.5TFC
20.7DSF
14.3TFC
295.1SRV
0AMHH 0616
259.2TFC
268.5SRV
320MSACOMPLETED REVERSAL MATCHED FOOTAGE
119.1TFC
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
320SAP
0MWL
320DSF
211.3TFC
165.6TFC
2MGOMAG COAT
2.1SAP
70.9TFC
2.1SSS
0MWM
320SRV
93.6TFC
141TFC

Properties (6)

custom_field_three
REINFORCEMENT VISIBLE
custom_field_two
2
customer
1
datetime
2021-03-01T22:19:08-08:00
documentation
PROPIPE
is_lateral_inspection
false