H 0887_H 0616_02222021_050542.mp4
4 ft. - Deposits Settled Compacted, 15 %of cross sectional area, from 03 to 07 o'clock, , within 8 inches of joint: YES, Start
4 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
8 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
30.8 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
35.7 ft. - General Photograph - SLUDGE
48.9 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"
53.1 ft. - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - PIPE MATERIAL
64.4 ft. - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - SLUDGE
| Distance | Code | Observation |
|---|---|---|
| 4 | MGO | PANEL / OTHER TRASH - 3 - 5 O'CLK. |
| 35.7 | MGP | SLUDGE |
| 70.4 | SAM | — |
| 48.9 | DSC | — |
| 4 | DSC | — |
| 30.8 | SRC | — |
| 70.4 | DSZ | SLUDGE |
| 0 | MWM | — |
| 0 | AMH | H 0887 |
| 53.1 | DSZ | PIPE MATERIAL |
| 30.8 | SRV | — |
| 48.9 | TBA | — |
| 4 | SAM | — |
| 70.4 | DSZ | PIPE MATERIAL |
| 0 | MWL | — |
| 70.4 | MSA | TRACTOR SINKING IN SLUDGE |
| 64.4 | DSZ | SLUDGE |
| 8 | SRC | — |
| 70.4 | SRV | — |