Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 22, 2021, 12:42 PM
  • H 0887_H 0616_02222021_050542.mp4

Date
02/22/2021
W/O
875314
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00191
PipeID
P11035
Time
4:42 AM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7842
Sewer Name
H JOINT OUTFALL H - UNIT 8H
City
BALDWIN PARK
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
24
Purpose
Routine Assessment
Project
RFIR_WO_875314_TV15237_FEB2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Width
39 in.
Upstream MH
H 0887
Downstream MH
H 0616
Dir. of Survey
Downstream
Length Surveyed
70.4 ft.
Total Length
70.4 ft.
Structural Index
5
Structural Quick
5B4B
Structural Rating
117
O&M Index
3
O&M Quick
3925
O&M Rating
37
Overall Index
4
Overall Quick
Overall Rating
154
Pipe schematic from manhole H 0887 to H 0616
MH: H 0887MH: H 0616downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 08870 ft. MWL - Water Level, 5 %of cross sectional area4 ft. MGO - General Observation - PANEL / OTHER TRASH - 3 - 5 O'CLK.4 ft. DSC - Deposits Settled Compacted, 15 %of cross sectional area, from 03 to 07 o'clock, , within 8 inches of joint: YES, Start4 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start30.8 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish30.8 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start35.7 ft. MGP - General Photograph - SLUDGE48.9 ft. DSC - Deposits Settled Compacted, 15 %of cross sectional area, from 03 to 07 o'clock, , within 8 inches of joint: YES, Finish48.9 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"53.1 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - PIPE MATERIAL64.4 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - SLUDGE70.4 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish70.4 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE70.4 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - PIPE MATERIAL70.4 ft. MSA - Survey Abandoned - TRACTOR SINKING IN SLUDGE70.4 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (8)

  • Deposits Settled Compacted,  15 %of cross sectional area, from 03 to 07 o'clock,  , within 8 inches of joint: YES, Start

    4 ft. - Deposits Settled Compacted, 15 %of cross sectional area, from 03 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    30.8 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph - SLUDGE

    35.7 ft. - General Photograph - SLUDGE

  • Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"

    48.9 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"

  • Deposits Settled Other,  10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start - PIPE MATERIAL

    53.1 ft. - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - PIPE MATERIAL

  • Deposits Settled Other,  10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start - SLUDGE

    64.4 ft. - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - SLUDGE

Observations (19)

DistanceCodeObservation
4MGOPANEL / OTHER TRASH - 3 - 5 O'CLK.
35.7MGPSLUDGE
70.4SAM
48.9DSC
4DSC
30.8SRC
70.4DSZSLUDGE
0MWM
0AMHH 0887
53.1DSZPIPE MATERIAL
30.8SRV
48.9TBA
4SAM
70.4DSZPIPE MATERIAL
0MWL
70.4MSATRACTOR SINKING IN SLUDGE
64.4DSZSLUDGE
8SRC
70.4SRV

Properties (7)

additional_info
630138022221002
custom_field_three
MSA, TRACTOR SINKING IN SLUDGE
custom_field_two
5
customer
1
datetime
2021-02-22T04:42:47-08:00
documentation
PROPIPE
is_lateral_inspection
false