Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 22, 2021, 10:29 AM
  • 21 0950B_21 0950A_02222021_024622.mp4

Date
02/22/2021
W/O
875031
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00760
PipeID
P16046
Time
2:29 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8614
Sewer Name
21 CLAREMONT OUTFALL TRUNK
City
CLAREMONT
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
07
Purpose
Routine Assessment
Project
WO_875031_TV21004_FEB2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
21 0950B
Downstream MH
21 0950A
Dir. of Survey
Downstream
Length Surveyed
403.9 ft.
Total Length
403.9 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 21 0950B to 21 0950A
MH: 21 0950BMH: 21 0950Adownstream0 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 21 0950B0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. MGO - General Observation - PIPE IS LINED140.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"343.4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 8"356.5 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"403.8 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK403.9 ft. AMH - Downstream Manhole, Survey Ends - 21 0950A

Observation photos (1)

  • General Observation - PIPE IS LINED

    2 ft. - General Observation - PIPE IS LINED

Observations (10)

DistanceCodeObservation
0MGOCONNECTION AT MH, 9 O'CLOCK
140.2TF
0MWL
2MGOPIPE IS LINED
403.9AMH21 0950A
0AMH21 0950B
343.4TF
0MWM
403.8MGOCONNECTION AT MH, 9 O'CLOCK
356.5TF

Properties (7)

custom_field_three
LINED PIPE
custom_field_two
4
customer
1
datetime
2021-02-22T02:29:28-08:00
documentation
PRO PIPE
is_lateral_inspection
false
lining
CIPP