Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 3, 2021, 09:03 AM
  • B 0508_B 0507A_03032021_011106.mp4

Date
03/03/2021
W/O
875022
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00099
PipeID
P21603
Time
1:03 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8627
Sewer Name
B JOINT OUTFALL B - UNIT 6E
City
ROSEMEAD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
27
Purpose
Routine Assessment
Project
WO_875022_TV15111_FEB2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Width
39 in.
Upstream MH
B 0508
Downstream MH
B 0507A
Dir. of Survey
Downstream
Length Surveyed
167.8 ft.
Total Length
167.8 ft.
Structural Index
2
Structural Quick
2F00
Structural Rating
66
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
66
Pipe schematic from manhole B 0508 to B 0507A
MH: B 0508MH: B 0507Adownstream0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - B 05080 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. MGO - General Observation - MAG COAT2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start166 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish167.8 ft. AMH - Downstream Manhole, Survey Ends - B 0507A167.8 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (2)

  • General Observation - CONNECTION AT MH 3 O'CLOCK

    0 ft. - General Observation - CONNECTION AT MH 3 O'CLOCK

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

Observations (9)

DistanceCodeObservation
2MGOMAG COAT
167.8AMHB 0507A
166SSS
167.8MGOCONNECTION AT MH 9 O'CLOCK
0MGOCONNECTION AT MH 3 O'CLOCK
0AMHB 0508
2.1SSS
0MWM
0MWL

Properties (6)

custom_field_three
SPALLING
custom_field_two
3
customer
1
datetime
2021-03-03T01:03:50-08:00
documentation
PRO PIPE
is_lateral_inspection
false