Wastewater/Activity/PacpInspection/1.0Feb 11, 2021, 07:16 AM
  • 14 0231A_14 0231_02102021_233236.mp4

Date
02/10/2021
W/O
870411
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00575
PipeID
P18282
Time
11:16 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8565
Sewer Name
14 NORTH SIDE TRUNK
City
LANCASTER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
05
Purpose
Routine Assessment
Project
RFIR_WO_870411_TV14057_JAN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0231A
Downstream MH
14 0231
Dir. of Survey
Downstream
Length Surveyed
422.5 ft.
Total Length
422.5 ft.
Structural Index
3
Structural Quick
3O22
Structural Rating
242
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
242
Pipe schematic from manhole 14 0231A to 14 0231
MH: 14 0231AMH: 14 0231downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 0231A2 ft. MWM - Water Mark, 20 %of cross sectional area15.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES16.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"28.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start51.8 ft. JOL - Joint Offset Large51.8 ft. JSL - Joint Separated Large57.8 ft. JSM - Joint Separated Medium75.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"137 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"199.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"257.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"320.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"377.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"420.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish422.5 ft. AMH - Downstream Manhole, Survey Ends - 14 0231

Observation photos (5)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    15.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    28.3 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Joint Offset Large

    51.8 ft. - Joint Offset Large

  • Joint Separated Large

    51.8 ft. - Joint Separated Large

  • Joint Separated Medium

    57.8 ft. - Joint Separated Medium

Observations (17)

DistanceCodeObservation
199.6TFC
15.7CM
137TFC
377.7TFC
257.2TFC
16.7TFC
51.8JOL
320.3TFC
51.8JSL
0MWL
75.2TFC
57.8JSM
28.3CM
422.5AMH14 0231
420.7CM
2MWM
0AMH14 0231A

Properties (7)

additional_info
630069021021202
custom_field_three
CRACKS/SEPERATED JOINTS
custom_field_two
2
customer
1
datetime
2021-02-10T23:16:35-08:00
documentation
PRO PIPE
is_lateral_inspection
false