Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 22, 2021, 12:01 PM
  • C 0391_C 0390_02222021_041757.mp4

Date
02/22/2021
W/O
875033
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00142
PipeID
P09855
Time
4:01 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8615
Sewer Name
C JOINT OUTFALL C - UNIT 8D
City
CERRITOS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
04
Purpose
Capital Improvement Program Assesment
Project
RFIR_WO_875033_TV19055_FEB2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
27 in.
Width
114 in.
Upstream MH
C 0391
Downstream MH
C 0390
Dir. of Survey
Downstream
Length Surveyed
392.4 ft.
Total Length
392.4 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2^00
O&M Rating
314
Overall Index
2
Overall Quick
Overall Rating
314
Pipe schematic from manhole C 0391 to C 0390
MH: C 0391MH: C 0390downstream0 ft. AMH - Upstream Manhole, Survey Begins - C 03910 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start14.1 ft. OBR - Obstacles Rocks, 5 %of cross sectional area, at 06 o'clock, Start295.2 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 10 o'clock, , within 8 inches of joint: YES320 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES336.8 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES392.4 ft. AMH - Downstream Manhole, Survey Ends - C 0390392.4 ft. OBR - Obstacles Rocks, 5 %of cross sectional area, at 06 o'clock, Finish392.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Obstacles Rocks, 5 %of cross sectional area, at 06 o'clock, Start

    14.1 ft. - Obstacles Rocks, 5 %of cross sectional area, at 06 o'clock, Start

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 10 o'clock,  , within 8 inches of joint: YES

    295.2 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 10 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    320 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    336.8 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

Observations (12)

DistanceCodeObservation
0AMHC 0391
2DAGS
0MWM
392.4AMHC 0390
14.1OBR
0MGOCONNECTION AT MH, 3 O'CLOCK
295.2DAE
392.4OBR
0MWL
392.4DAGS
336.8DAE
320DAE

Properties (7)

custom_field_three
GREASE, DEBRIS
custom_field_two
3
customer
1
datetime
2021-02-22T04:01:51-08:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
26643