- Date
- 02/17/2021
- W/O
- 875040
- Weather
- Dry
- Operator/Surveyor
- M.MARTINEZ
- Sewer ID
- Z00780
- PipeID
- P16228
- Time
- 1:32 AM
- Certificate
- U-115-06022794
- System Owner
- 1
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- K8607
- Sewer Name
- 21 POMONA BOULEVARD INTERCEPTOR TRUNK
- City
- POMONA
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 21
- Page No.
- 14
- Purpose
- Routine Assessment
- Project
- RFIR_WO_875040_TV21085_FEB2021
- Sewer Type
- Gravity
- Material
- Vitrified Clay Pipe
- Shape
- Circular
- Height
- 27 in.
- Width
- 27 in.
- Upstream MH
- 21 1134
- Downstream MH
- 21 1133
- Dir. of Survey
- Downstream
- Length Surveyed
- 473.3 ft.
- Total Length
- 473.3 ft.
- Structural Index
- 3
- Structural Quick
- 3J2J
- Structural Rating
- 265
- O&M Index
- 4
- O&M Quick
- 4A21
- O&M Rating
- 42
- Overall Index
- 3
- Overall Quick
- —
- Overall Rating
- 307
Pipe schematic from manhole 21 1134 to 21 1133 Observation photos (6)

2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

2 ft. - Alignment Left, 40 %, Start

2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

169.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

169.2 ft. - Material Change, Reinforced concrete pipe

434.9 ft. - Material Change, Vitrified clay pipe