Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 9, 2021, 09:29 AM
  • 14 0241_14 0240_02092021_015051.mp4

Date
02/09/2021
W/O
870403
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00569
PipeID
P18294
Time
1:29 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8561
Sewer Name
14 AVENUE "H" TRUNK
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
05
Purpose
Routine Assessment
Project
RFIR_WO_870403_TV14071_JAN2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
14 0241
Downstream MH
14 0240
Dir. of Survey
Downstream
Length Surveyed
600.2 ft.
Total Length
600.2 ft.
Structural Index
3
Structural Quick
5F3W
Structural Rating
765
O&M Index
2
O&M Quick
412W
O&M Rating
242
Overall Index
3
Overall Quick
Overall Rating
1007
Pipe schematic from manhole 14 0241 to 14 0240
MH: 14 0241MH: 14 0240downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 02412 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 65% MAG COAT2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start430.2 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start598.1 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish598.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish598.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish598.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish600.2 ft. AMH - Downstream Manhole, Survey Ends - 14 0240

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    430.2 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
2DAGS
2MGO65% MAG COAT
600.2AMH14 0240
598.2DAGS
0MWM
598.2SAP
2SAP
2SSS
598.2SSS
0MWL
0AMH14 0241
430.2SRV
598.1SRV

Properties (7)

additional_info
630069020821203
custom_field_three
VISIBLE REINFORCEMENT/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-02-09T01:29:31-08:00
documentation
PRO PIPE
is_lateral_inspection
false