Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 17, 2021, 05:48 AM
  • H 0114_H 0113_02162021_220346.mp4

Date
02/16/2021
W/O
875062
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00165
PipeID
P10565
Time
9:48 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8573
Sewer Name
H JOINT OUTFALL H - UNIT 1F
City
HUNTINGTON PARK
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_875062_TV01242_FEB2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
H 0114
Downstream MH
H 0113
Dir. of Survey
Downstream
Length Surveyed
479.8 ft.
Total Length
479.8 ft.
Structural Index
3
Structural Quick
3R2R
Structural Rating
475
O&M Index
2
O&M Quick
2R00
O&M Rating
190
Overall Index
2
Overall Quick
Overall Rating
665
Pipe schematic from manhole H 0114 to H 0113
MH: H 0114MH: H 0113downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 01140 ft. MGO - General Observation - ROACHES @ MH0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 45% MAG COAT341.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN478 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish478 ft. MGO - General Observation - ROACHES @ MH478 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish478 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish479.8 ft. AMH - Downstream Manhole, Survey Ends - H 0113

Observation photos (5)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    478 ft. - General Observation - ROACHES @ MH

Observations (14)

DistanceCodeObservation
341.5TFOPEN
2DAGS
2SSS
0AMHH 0114
0MGOROACHES @ MH
2SAP
2MGO45% MAG COAT
478SAP
0MWM
479.8AMHH 0113
478MGOROACHES @ MH
0MWL
478SSS
478DAGS

Properties (7)

additional_info
630069021621201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-02-16T21:48:42-08:00
documentation
PRO PIPE
is_lateral_inspection
false