Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 17, 2021, 08:29 AM
  • H 0111_H 0109_02172021_004527.mp4

Date
02/17/2021
W/O
875062
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00165
PipeID
P10562
Time
12:29 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8573
Sewer Name
H JOINT OUTFALL H - UNIT 1F
City
HUNTINGTON PARK
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
07
Purpose
Routine Assessment
Project
RFIR_WO_875062_TV01242_FEB2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
H 0111
Downstream MH
H 0109
Dir. of Survey
Downstream
Length Surveyed
472.3 ft.
Total Length
472.3 ft.
Structural Index
3
Structural Quick
513R
Structural Rating
470
O&M Index
2
O&M Quick
2R00
O&M Rating
186
Overall Index
2
Overall Quick
Overall Rating
656
Pipe schematic from manhole H 0111 to H 0109
MH: H 0111MH: H 0109downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 01110 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 40% MAG COAT2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start468.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish468.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish468.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish472.3 ft. MGO - General Observation - ROACHES @ MH472.3 ft. MGO - General Observation - STOP LOG CONN @ MH 3 O'CLOCK472.3 ft. AMH - Downstream Manhole, Survey Ends - H 0109

Observation photos (5)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    472.3 ft. - General Observation - ROACHES @ MH

Observations (14)

DistanceCodeObservation
2SAP
0MWL
2MGO40% MAG COAT
468.7SSS
0AMHH 0111
472.3MGOROACHES @ MH
468.7SAP
0MWM
472.3MGOSTOP LOG CONN @ MH 3 O'CLOCK
2SRV
468.7DAGS
2SSS
472.3AMHH 0109
2DAGS

Properties (7)

additional_info
630069021621201
custom_field_three
VISIBLE REINFORCEMENT/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-02-17T00:29:04-08:00
documentation
PRO PIPE
is_lateral_inspection
false