Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 17, 2021, 08:46 AM
  • H 0109_H 0108_02172021_005322.mp4

Date
02/17/2021
W/O
875062
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00165
PipeID
P10560
Time
12:46 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8573
Sewer Name
H JOINT OUTFALL H - UNIT 1F
City
HUNTINGTON PARK
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_875062_TV01242_FEB2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
H 0109
Downstream MH
H 0108
Dir. of Survey
Downstream
Length Surveyed
57.9 ft.
Total Length
57.9 ft.
Structural Index
3
Structural Quick
523A
Structural Rating
60
O&M Index
2
O&M Quick
2A00
O&M Rating
22
Overall Index
2
Overall Quick
Overall Rating
82
Pipe schematic from manhole H 0109 to H 0108
MH: H 0109MH: H 0108downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 01090 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 60% MAG COAT8.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start43.3 ft. SRV - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES57.9 ft. AMH - Downstream Manhole, Survey Ends - H 010857.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish57.9 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE57.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish57.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish57.9 ft. SRV - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES

    43.3 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES

  • Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES

    57.9 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES

Observations (14)

DistanceCodeObservation
57.9AMHH 0108
43.3SRV
2DAGS
57.9SSS
57.9MGOCONN @ MH 9 O'CLOCK/ACTIVE
0AMHH 0109
2MGO60% MAG COAT
57.9SAP
57.9DAGS
0MWM
8.9SSS
0MWL
57.9SRV
8.9SAP

Properties (7)

additional_info
630069021621201
custom_field_three
VISIBLE REINFORCEMENT/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-02-17T00:46:24-08:00
documentation
PRO PIPE
is_lateral_inspection
false