Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 17, 2021, 11:44 AM
  • H 0103_H 0102_02172021_041001.mp4

Date
02/17/2021
W/O
875062
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00165
PipeID
P10555
Time
3:44 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8573
Sewer Name
H JOINT OUTFALL H - UNIT 1F
City
HUNTINGTON PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_875062_TV01242_FEB2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Width
39 in.
Upstream MH
H 0103
Downstream MH
H 0102
Dir. of Survey
Downstream
Length Surveyed
610.1 ft.
Total Length
610.1 ft.
Structural Index
3
Structural Quick
3W2W
Structural Rating
605
O&M Index
2
O&M Quick
2W00
O&M Rating
242
Overall Index
2
Overall Quick
Overall Rating
847
Pipe schematic from manhole H 0103 to H 0102
MH: H 0103MH: H 0102downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 01030 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 40% MAG COAT2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start605.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish605.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish605.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish610.1 ft. MGO - General Observation - ROACHES @ MH610.1 ft. AMH - Downstream Manhole, Survey Ends - H 0102

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
610.1MGOROACHES @ MH
2SAP
610.1AMHH 0102
0AMHH 0103
605.8DAGS
2DAGS
2MGO40% MAG COAT
2SSS
0MWM
0MWL
605.8SAP
605.8SSS

Properties (7)

additional_info
630069021621201
custom_field_three
PROJECTING AGGREGATE/ SPALLING
custom_field_two
3
customer
1
datetime
2021-02-17T03:44:21-08:00
documentation
PRO PIPE
is_lateral_inspection
false