Wastewater/Activity/PacpInspection/1.0Feb 16, 2021, 09:44 AM
  • A 0215_A 0214_02162021_020235.mp4

Date
02/16/2021
W/O
875677
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00323
PipeID
P08151
Time
1:44 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8571
Sewer Name
A JOA-1A LOS COYOTES WRP INTERCEPTOR
City
SOUTH GATE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
26
Purpose
Routine Assessment
Project
RFIR_WO_875677_TV02346_FEB2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
75 in.
Width
39 in.
Upstream MH
A 0215
Downstream MH
A 0214
Dir. of Survey
Downstream
Length Surveyed
130.5 ft.
Total Length
130.5 ft.
Structural Index
3
Structural Quick
3D2D
Structural Rating
128
O&M Index
2
O&M Quick
2D00
O&M Rating
50
Overall Index
2
Overall Quick
Overall Rating
178
Pipe schematic from manhole A 0215 to A 0214
MH: A 0215MH: A 0214downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - A 02150 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. MGO - General Observation - 70% MAG COAT2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start128 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish128 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish129.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish130.5 ft. AMH - Downstream Manhole, Survey Ends - A 0214

Observation photos (2)

  • General Observation - 70% MAG COAT

    2 ft. - General Observation - 70% MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
130.5AMHA 0214
129.6SAP
0MWL
0AMHA 0215
128DAGS
128SSS
0MWM
2MGO70% MAG COAT
2SSS
2SAP
2DAGS

Properties (8)

additional_info
630069021521202
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2021-02-16T01:44:59-08:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
28636