Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 23, 2021, 11:27 AM
  • E 0191_01 0423_3232021_045819.mp4

Date
03/23/2021
W/O
0880122
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00208
PipeID
P02157
Time
4:27 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1755
Sewer Name
01 HOLMES-WILLOWBROOK TRUNK
City
WESTMONT
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
10
Purpose
Capital Improvement Program Assesment
Project
20210323MDM_HOLMES_WILLOWBROOK_TRUNK
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
01 0423
Downstream MH
E 0191
Dir. of Survey
Upstream
Length Surveyed
93.5 ft.
Total Length
93.5 ft.
Structural Index
3
Structural Quick
4222
Structural Rating
12
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
14
Pipe schematic from manhole 01 0423 to E 0191
MH: 01 0423MH: E 0191upstream0 ft. AMH - Downstream Manhole, Survey Ends - 5:15AM STOPLOG IN PLACE0.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE0.4 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG26.1 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG26.1 ft. MGO - General Observation - 95% MAG COAT FINISH78.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERIN CONCRETE89.5 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - ROCK91.5 ft. MGO - General Observation - MAG COAT 95% START91.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT91.5 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG93.5 ft. AMH - Upstream Manhole, Survey Begins - 5:00AM93.5 ft. MWM - Water Mark, 20 %of cross sectional area93.5 ft. MWL - Water Level, 5 %of cross sectional area - NO FLOW STOPLOG IN PLACE UPSTREAM93.5 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active

Observation photos (6)

  • General Observation - MAG COAT 95% START

    2 ft. - General Observation - MAG COAT 95% START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERIN CONCRETE

    14.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERIN CONCRETE

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    67.4 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Downstream Manhole, Survey Ends - 5:15AM STOPLOG IN PLACE

    93.5 ft. - Downstream Manhole, Survey Ends - 5:15AM STOPLOG IN PLACE

Observations (14)

DistanceCodeObservation
2MGOMAG COAT 95% START
93.5AMH5:15AM STOPLOG IN PLACE
0AMH5:00AM
14.7SSSBLISTERIN CONCRETE
0MWM
0MWLNO FLOW STOPLOG IN PLACE UPSTREAM
2SSSBLISTERING PEELING CONCRETE UNDER MAG COAT
93.1SSSBLISTERING PEELING CONCRETE
67.4SAMSEVERE AGG
67.4MGO95% MAG COAT FINISH
93.1SAMSEVERE AGG
4DSZROCK
2SAMSEVERE AGG
0MGOConn. @ Mh, 9 O' Clock. Active

Properties (6)

custom_field_three
SEVERE AGG MISSING
custom_field_two
2
customer
LACSD
datetime
2021-03-23T04:27:00-07:00
documentation
MARTIN,OLIVER 111,CASTILLO,RUVALCABA
is_lateral_inspection
false