B 0304_B 0233_02232021_032655.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - General Observation - 70% MAG COAT
14.1 ft. - Alignment Left, 15 %
301.9 ft. - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: YES, 8" - OPEN
301.9 ft. - Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: YES
354.9 ft. - Deposits Settled Fine, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start
610.1 ft. - Survey Abandoned - DUE TO SLUDGE
| Distance | Code | Observation |
|---|---|---|
| 301.9 | TB | OPEN |
| 0 | AMH | B 0233 |
| 0 | MGO | CONN @ MH 9 O'CLOCK/ACTIVE |
| 14.1 | LL | — |
| 2 | SSS | — |
| 0 | MWM | — |
| 0 | MWL | — |
| 2 | MGO | 70% MAG COAT |
| 610.1 | MSA | DUE TO SLUDGE |
| 301.9 | SAP | — |
| 609.9 | SSS | — |
| 609.9 | DSF | — |
| 354.9 | DSF | — |