Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 1, 2021, 10:14 AM
  • B 0345_B 0344_03012021_023157.mp4

Date
03/01/2021
W/O
875026
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00087
PipeID
P08836
Time
2:14 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8491
Sewer Name
B JOINT OUTFALL B - UNIT 3A RELIEF
City
EL MONTE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
21
Purpose
Routine Assessment
Project
WO_875026_TV15104_FEB2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
45 in.
Width
63 in.
Upstream MH
B 0345
Downstream MH
B 0344
Dir. of Survey
Downstream
Length Surveyed
819.4 ft.
Total Length
819.4 ft.
Structural Index
2
Structural Quick
2_00
Structural Rating
324
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
324
Pipe schematic from manhole B 0345 to B 0344
MH: B 0345MH: B 0344downstream0 ft. AMH - Upstream Manhole, Survey Begins - B 03450 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2.3 ft. MGO - General Observation - MAG COAT2.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start92 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - POSSIBLE CONNECTION813 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish819.4 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK819.4 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK819.4 ft. AMH - Downstream Manhole, Survey Ends - B 0344

Observations (10)

DistanceCodeObservation
813SSS
819.4MGOCONNECTION AT THE MH 9 OC'LOCK
2.3MGOMAG COAT
0AMHB 0345
0MWL
2.3SSS
92TFPOSSIBLE CONNECTION
819.4MGOCONNECTION AT THE MH 3 OC'LOCK
819.4AMHB 0344
0MWM

Properties (7)

additional_info
630074030121001
custom_field_three
NO SEVERE DEFECTS
custom_field_two
3
customer
1
datetime
2021-03-01T02:14:14-08:00
documentation
PROPIPE
is_lateral_inspection
false