Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 30, 2016, 08:55 AM
Date
04/30/2016
W/O
0563839
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00016
PipeID
P00007
Time
1:55 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6697
Sewer Name
08 MAIN STREET TRUNK
City
CARSON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
07
Purpose
Capital Improvement Program Assesment
Project
20160430MDM_MAIN_STREET_TRUNK
Material
RCP-CTL
Shape
Circular
Height
33 in.
Upstream MH
08 0007
Downstream MH
08 0006
Dir. of Survey
Downstream
Length Surveyed
15 ft.
Total Length
15 ft.
Structural Index
5
Structural Quick
5242
Structural Rating
18
O&M Index
5
O&M Quick
5100
O&M Rating
5
Overall Index
5
Overall Quick
Overall Rating
23
Pipe schematic from manhole 08 0007 to 08 0006
MH: 08 0007MH: 08 0006downstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MGO - General Observation - MH CONN OPEN 9:000 ft. AMH - Upstream Manhole, Survey Begins - 7:15AM0 ft. MWM - Water Mark, 80 %of cross sectional area0 ft. MGO - General Observation - MH CONN ACTIVE 3:002 ft. SRV - Surface Reinforcement Visible, from 11 to 02 o'clock, within 8 inches of joint: YES, Start - LONG & CIRCUM REBAR2 ft. SAM - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG5 ft. SRV - Surface Reinforcement Visible, from 11 to 02 o'clock, within 8 inches of joint: YES, Finish5 ft. MGO - General Observation - MAG COAT 70% START5 ft. MGO - General Observation - MISSING BTILES 10% START UNDER MAG COAT5 ft. MGP - General Photograph13.8 ft. MGO - General Observation - MISSING TILES 90%14.5 ft. SAM - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish14.5 ft. MGO - General Observation - MAG COAT 70% FINISH14.5 ft. MGO - General Observation - MH CONN ACTIVE 9:0015 ft. AMH - Downstream Manhole, Survey Ends - 7:30AM

Observation photos (5)

  • Surface Reinforcement Visible, from 11 to 02 o'clock, within 8 inches of joint: YES, Start - LONG & CIRCUM REBAR

    2 ft. - Surface Reinforcement Visible, from 11 to 02 o'clock, within 8 inches of joint: YES, Start - LONG & CIRCUM REBAR

  • General Observation - MAG COAT 70% START

    5 ft. - General Observation - MAG COAT 70% START

  • General Observation - MISSING BTILES 10% START UNDER MAG COAT

    5 ft. - General Observation - MISSING BTILES 10% START UNDER MAG COAT

  • General Photograph

    5 ft. - General Photograph

  • General Observation - MISSING TILES 90%

    13.8 ft. - General Observation - MISSING TILES 90%

Observations (16)

DistanceCodeObservation
14.5SAM
14.5MGOMAG COAT 70% FINISH
5SRV
5MGOMAG COAT 70% START
0MWL
2SRVLONG & CIRCUM REBAR
2SAMSEVERE AGG
15AMH7:30AM
0MGOMH CONN OPEN 9:00
14.5MGOMH CONN ACTIVE 9:00
5MGOMISSING BTILES 10% START UNDER MAG COAT
5MGP
0AMH7:15AM
0MWM
13.8MGOMISSING TILES 90%
0MGOMH CONN ACTIVE 3:00

Properties (6)

custom_field_three
VISIBLE LONG & CIRCUM REBAR
custom_field_two
2
customer
LACSD
datetime
2016-04-30T01:55:46-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false