2 ft. - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG AREAS OF MISSING TILES
2 ft. - General Observation - MISSING TILES100% START
10.6 ft. - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE
15.4 ft. - Surface Reinforcement Visible, from 01 to 02 o'clock, within 8 inches of joint: NO - CIRCUM
37.7 ft. - Water Mark, 85 %of cross sectional area
37.7 ft. - General Observation - MAG COAT 90% START
51.4 ft. - Surface Reinforcement Visible, from 12 to 01 o'clock, within 8 inches of joint: NO - CIRCUN
52.6 ft. - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES - LONG REBAR
267.2 ft. - Water Mark, 80 %of cross sectional area
281.2 ft. - General Observation - NEW MISSING TILES
338.8 ft. - Surface Reinforcement Visible, at 11 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
| Distance | Code | Observation |
|---|---|---|
| 341.3 | MGO | MISSING TILES 15% FINISH |
| 267.2 | MWM | — |
| 2 | SAM | SEVERE AGG AREAS OF MISSING TILES |
| 37.7 | MGO | MISSING TILES 10% START 11:00 TO 1:00 START |
| 52.6 | SRV | LONG REBAR |
| 51.4 | MGO | MISSING TILES 15% %START |
| 2 | MGO | MISSING TILES100% START |
| 15.4 | SRV | CIRCUM |
| 341.3 | SAM | SEVERE AGG AREAS MISSING TILES |
| 341.8 | AMH | 4:25AM |
| 37.7 | MWM | — |
| 338.8 | SRV | CIRCUM REBAR |
| 341.3 | DSZ | TILES & DEBRIE |
| 2 | DSZ | FALLEN TILES & DEBRIE |
| 51.4 | SRV | CIRCUN |
| 23.3 | MGO | TILES 100% IN PLACE |
| 0 | MWL | — |
| 10.6 | SAM | SEVERE |
| 281.2 | MGO | NEW MISSING TILES |
| 0 | MWM | — |
| 37.7 | MGO | MAG COAT 90% START |
| 0 | AMH | 3:50AM |