- Date
- 04/27/2016
- W/O
- 0558014
- Weather
- Dry
- Operator/Surveyor
- MARTIN
- Sewer ID
- Z00523
- PipeID
- P05932
- Time
- 12:53 AM
- Certificate
- U-1014-06022543
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- H0115
- Sewer Name
- 05 SOUTH INGLEWOOD-ORANGE AVENUE TRUNK, EXTENSION #2
- City
- INGLEWOOD
- Loc. details
- Main Highway - Urban
- Location Code
- A
- Use of Sewer
- Sanitary Sewer
- District
- District 05
- Page No.
- 07
- Purpose
- Capital Improvement Program Assesment
- Project
- 20160427MDM_SOUTH_INGLEWOOD_ORANGE_AVENUE_TRUNK_EXTENSION_2
- Material
- Vitrified Clay Pipe
- Shape
- Circular
- Height
- 8 in.
- Upstream MH
- 05 0700
- Downstream MH
- 05 0699
- Dir. of Survey
- Downstream
- Length Surveyed
- 43.6 ft.
- Total Length
- 43.6 ft.
- Structural Index
- 3
- Structural Quick
- 3422
- Structural Rating
- 16
- O&M Index
- 3
- O&M Quick
- 4131
- O&M Rating
- 11
- Overall Index
- 3
- Overall Quick
- —
- Overall Rating
- 27
Pipe schematic from manhole 05 0700 to 05 0699 Observation photos (4)

20.7 ft. - Water Level, 100 %of cross sectional area - POSSIBLE FULL PIPE AT TIMES

21.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start

43.4 ft. - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES - ROCK

43.6 ft. - Survey Abandoned - 20% ROCK OR ASPHALT