2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING LAITANCE COAT & CONCRETE
2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
8 ft. - General Observation - 30" RCP
29.3 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING LAITANCE COAT
68.1 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
90 ft. - General Observation - DEBRIE TOP OF PIPE -POSSIBLE FULL PIPE AT TIMES
157.3 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES
169 ft. - Water Mark, 40 %of cross sectional area
208.7 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG
| Distance | Code | Observation |
|---|---|---|
| 68.1 | SAM | SEVERE AGG |
| 322.6 | AMH | 3:20AM |
| 322.3 | SAP | SEVERE AGG |
| 8 | MGO | 30" RCP |
| 156.7 | TF | Active |
| 0 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 0 | AMH | 2:45AM |
| 2 | SSS | PEELING LAITANCE COAT & CONCRETE |
| 0 | MWM | — |
| 125.2 | MGO | POSSIBLE DEBRIE UNDER FLOW |
| 169 | MWM | — |
| 29.3 | SSS | PEELING LAITANCE COAT |
| 322.3 | SSS | PEELING LAITANCE COAT & CONCRETE |
| 208.7 | SAM | SEVERE AGG |
| 322.3 | SAM | SEVERE AGG |
| 2 | SAP | SEVERE AGG |
| 90 | MGO | DEBRIE TOP OF PIPE -POSSIBLE FULL PIPE AT TIMES |
| 0 | MWL | — |
| 169 | MWL | — |
| 157.3 | SSS | — |