Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 14, 2016, 08:57 AM
  • B 0607_B 0606_04142016_Manual.mp4

Date
04/14/2016
W/O
0552359
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00105
PipeID
P09179
Time
1:57 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6689
Sewer Name
B JOINT OUTFALL B - UNIT 8B
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
16
Purpose
Routine Assessment
Project
20160413MDM_JOINT_OUTFALL_B_UNIT_8B
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Upstream MH
B 0607
Downstream MH
B 0606
Dir. of Survey
Downstream
Length Surveyed
427.5 ft.
Total Length
427.5 ft.
Structural Index
2
Structural Quick
2P00
Structural Rating
172
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
172
Pipe schematic from manhole B 0607 to B 0606
MH: B 0607MH: B 0606downstream0 ft. AMH - Upstream Manhole, Survey Begins - 2:35AM0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. MGO - General Observation - MAG COAT 85% 8:00 TO 4:00 START2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING LAITANCE COAT UNDER MAG COAT100.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN182.7 ft. SSS - Surface Spalling, from 02 to 04 o'clock, within 8 inches of joint: NO - PEELING LAITANCE COAT380.6 ft. MGP - General Photograph427.1 ft. MGO - General Observation - MAG COAT 85% FINISH427.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING LAITANCE COAT427.1 ft. MGO - General Observation - MH CONN OPEN 3:00427.5 ft. AMH - Downstream Manhole, Survey Ends - 3:10AM

Observation photos (4)

  • General Observation - MAG COAT 85% 8:00 TO 4:00 START

    2 ft. - General Observation - MAG COAT 85% 8:00 TO 4:00 START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING LAITANCE COAT UNDER MAG COAT

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING LAITANCE COAT UNDER MAG COAT

  • Surface Spalling, from 02 to 04 o'clock, within 8 inches of joint: NO - PEELING LAITANCE COAT

    182.7 ft. - Surface Spalling, from 02 to 04 o'clock, within 8 inches of joint: NO - PEELING LAITANCE COAT

  • General Photograph

    380.6 ft. - General Photograph

Observations (12)

DistanceCodeObservation
182.7SSSPEELING LAITANCE COAT
427.1MGOMAG COAT 85% FINISH
2MGOMAG COAT 85% 8:00 TO 4:00 START
427.1SSSPEELING LAITANCE COAT
427.1MGOMH CONN OPEN 3:00
2SSSPEELING BLISTERING LAITANCE COAT UNDER MAG COAT
100.9TFOPEN
0AMH2:35AM
0MWL
0MWM
380.6MGP
427.5AMH3:10AM

Properties (6)

custom_field_three
PEELING LAITANCE COAT - 85% MAG COAT
custom_field_two
4
customer
LACSD
datetime
2016-04-14T01:57:42-07:00
documentation
MARTIN,MANANES,OLIVER 111
is_lateral_inspection
false