Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 13, 2016, 09:20 AM
Date
04/13/2016
W/O
0552359
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00105
PipeID
P09184
Time
2:20 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6688
Sewer Name
B JOINT OUTFALL B - UNIT 8B
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
16
Purpose
Routine Assessment
Project
20160413MDM_JOINT_OUTFALL_B_UNIT_8B
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Upstream MH
B 0612
Downstream MH
B 0611
Dir. of Survey
Downstream
Length Surveyed
369.9 ft.
Total Length
369.9 ft.
Structural Index
3
Structural Quick
3O2N
Structural Rating
388
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
388
Pipe schematic from manhole B 0612 to B 0611
MH: B 0612MH: B 0611downstream0 ft. AMH - Upstream Manhole, Survey Begins - 2:20AM0 ft. MGO - General Observation - MH CONN OPEN 9:000 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - LAITANCE COAT PEELING BLISTERING2 ft. MGO - General Observation - MAG COAT 85% START 8:00 TO 4:002 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT21.7 ft. SAV - Surface Aggregate Visible, from 01 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG UNDER MAG COAT27.1 ft. SAV - Surface Aggregate Visible, from 10 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG39.3 ft. SAV - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG149.5 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 6", 6" - ACTIVE245.1 ft. SAV - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG255.9 ft. SAV - Surface Aggregate Visible, from 08 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG269.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE342.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG342.7 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE369.6 ft. MGO - General Observation - MAG COAT 85% FINISH369.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG369.6 ft. MGO - General Observation - MH CONN ACTIVE 3:00369.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING BLISTERING LAITANCE COAT369.6 ft. MGO - General Observation - MH CONN OPEN 9:00369.9 ft. AMH - Downstream Manhole, Survey Ends - 2:50AM

Observation photos (8)

  • General Observation - MAG COAT 85% START 8:00 TO 4:00

    2 ft. - General Observation - MAG COAT 85% START 8:00 TO 4:00

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT

  • Surface Aggregate Visible, from 01 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG UNDER MAG COAT

    21.7 ft. - Surface Aggregate Visible, from 01 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG UNDER MAG COAT

  • Surface Aggregate Visible, from 10 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG

    27.1 ft. - Surface Aggregate Visible, from 10 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG

    39.3 ft. - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG

    245.1 ft. - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Visible, from 08 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG

    255.9 ft. - Surface Aggregate Visible, from 08 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    342.7 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

Observations (22)

DistanceCodeObservation
369.9AMH2:50AM
39.3SAVSEVERE AGG
369.6MGOMAG COAT 85% FINISH
2SSSLAITANCE COAT PEELING BLISTERING
0AMH2:20AM
245.1SAVSEVERE AGG
369.6SAVSEVERE AGG
369.6MGOMH CONN ACTIVE 3:00
269.3TFACTIVE
342.7SAVSEVERE AGG
255.9SAVSEVERE AGG
21.7SAVSEVERE AGG UNDER MAG COAT
0MGOMH CONN OPEN 9:00
0MWM
27.1SAVSEVERE AGG
369.6SSSPEELING BLISTERING LAITANCE COAT
0MWL
2MGOMAG COAT 85% START 8:00 TO 4:00
2SAVSEVERE AGG UNDER MAG COAT
369.6MGOMH CONN OPEN 9:00
342.7TFACTIVE
149.5TFACTIVE

Properties (6)

custom_field_three
SEVERE AGG VISIBLE
custom_field_two
3
customer
LACSD
datetime
2016-04-13T02:20:00-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false