Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 6, 2016, 08:21 AM
  • 05 0041_05 0040_04062016_Manual.mp4

Date
04/06/2016
W/O
0552270
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00431
PipeID
P05327
Time
1:21 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6680
Sewer Name
05 DISTRICT #5 MAIN TRUNK
City
TORANCE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
24
Purpose
Routine Assessment
Project
20160406MDM_DISTRICT_5_MAIN_TRUNK
Material
RCP-CTL
Shape
Circular
Height
48 in.
Upstream MH
05 0041
Downstream MH
05 0040
Dir. of Survey
Downstream
Length Surveyed
659.3 ft.
Total Length
659.3 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole 05 0041 to 05 0040
MH: 05 0041MH: 05 0040downstream0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:55AM8 ft. MGO - General Observation - 48" RCP-CTL-FR POLY13.7 ft. DSGV - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO - ROCKS15.2 ft. MGO - General Observation - WHITE BUILD UP GROWING ON PIPE15.2 ft. MGP - General Photograph202 ft. MGP - General Photograph433.2 ft. MGO - General Observation - 48" RCP-CTL FR POLY527.7 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE659.3 ft. AMH - Downstream Manhole, Survey Ends - 5:35AM

Observation photos (5)

  • General Observation - 48" RCP-CTL-FR POLY

    8 ft. - General Observation - 48" RCP-CTL-FR POLY

  • General Observation - WHITE BUILD UP GROWING ON PIPE

    15.2 ft. - General Observation - WHITE BUILD UP GROWING ON PIPE

  • General Photograph

    15.2 ft. - General Photograph

  • General Photograph

    202 ft. - General Photograph

  • General Observation - 48" RCP-CTL FR POLY

    433.2 ft. - General Observation - 48" RCP-CTL FR POLY

Observations (11)

DistanceCodeObservation
202MGP
0MWM
8MGO48" RCP-CTL-FR POLY
15.2MGOWHITE BUILD UP GROWING ON PIPE
659.3AMH5:35AM
433.2MGO48" RCP-CTL FR POLY
0MWL
15.2MGP
527.7TFACTIVE
0AMH4:55AM
13.7DSGVROCKS

Properties (5)

custom_field_two
4
customer
LACSD
datetime
2016-04-06T01:21:16-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false