Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 6, 2016, 08:19 AM
  • 05 0042_05 0041_04062016_Manual.mp4

Date
04/06/2016
W/O
0552270
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00431
PipeID
P05328
Time
1:19 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6680
Sewer Name
05 DISTRICT #5 MAIN TRUNK
City
TORANCE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
24
Purpose
Routine Assessment
Project
20160406MDM_DISTRICT_5_MAIN_TRUNK
Material
RCP-CTL
Shape
Circular
Height
48 in.
Upstream MH
05 0042
Downstream MH
05 0041
Dir. of Survey
Downstream
Length Surveyed
659.4 ft.
Total Length
659.4 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
4
Pipe schematic from manhole 05 0042 to 05 0041
MH: 05 0042MH: 05 0041downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 07 to 08 o'clock, , within 8 inches of joint: NO - PAPER- RAGS0 ft. AMH - Upstream Manhole, Survey Begins - 2:50AM0 ft. MGO - General Observation - MH COPNN ACTIVE 9:000 ft. MWL - Water Level, 10 %of cross sectional area8.7 ft. MGO - General Observation - WHITE BULDUP GROWING ON PIPE8.7 ft. MGO - General Observation - 48" RCP-CTL FR POLY53.9 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO - PAPER-RAGS129.4 ft. MGP - General Photograph463.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE574.7 ft. MWL - Water Level, 5 %of cross sectional area659.4 ft. AMH - Downstream Manhole, Survey Ends - 3:30AM

Observation photos (4)

  • General Observation - WHITE BULDUP GROWING ON PIPE

    8.7 ft. - General Observation - WHITE BULDUP GROWING ON PIPE

  • General Observation - 48" RCP-CTL FR POLY

    8.7 ft. - General Observation - 48" RCP-CTL FR POLY

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: NO - PAPER-RAGS

    53.9 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO - PAPER-RAGS

  • General Photograph

    129.4 ft. - General Photograph

Observations (12)

DistanceCodeObservation
8.7MGOWHITE BULDUP GROWING ON PIPE
659.4AMH3:30AM
463.6TFACTIVE
129.4MGP
0MWM
0DSZPAPER- RAGS
574.7MWL
0AMH2:50AM
0MGOMH COPNN ACTIVE 9:00
8.7MGO48" RCP-CTL FR POLY
53.9DSZPAPER-RAGS
0MWL

Properties (5)

custom_field_two
4
customer
LACSD
datetime
2016-04-06T01:19:56-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false