Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 22, 2017, 08:46 AM
  • H 0078_H 0077_3222017_031125.mp4

Date
03/22/2017
W/O
0619086
Weather
Light Rain
Operator/Surveyor
MARTIN
Sewer ID
Z00164
PipeID
P10530
Time
1:46 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0474
Sewer Name
H JOINT OUTFALL H - UNIT 1E
City
SOUTH GATE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
11
Purpose
Routine Assessment
Project
20170322MDM_JOINT_OUTFALL_H_UNIT_1E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
32.5 in.
Upstream MH
H 0078
Downstream MH
H 0077
Dir. of Survey
Downstream
Length Surveyed
134.8 ft.
Total Length
134.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
4
Pipe schematic from manhole H 0078 to H 0077
MH: H 0078MH: H 0077downstream0 ft. AMH - Upstream Manhole, Survey Begins - 3:15AM0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 60 %of cross sectional area8 ft. MGO - General Observation - 32.5" RCP-PVC28.1 ft. MWM - Water Mark, 40 %of cross sectional area28.1 ft. MGO - General Observation - 32.5" RCP-PVC82.5 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Active134.4 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Capped134.4 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. OPEN134.8 ft. AMH - Downstream Manhole, Survey Ends - 3:20AM

Observation photos (2)

  • General Observation - 32.5" RCP-PVC

    8 ft. - General Observation - 32.5" RCP-PVC

  • General Observation - 32.5" RCP-PVC

    28.1 ft. - General Observation - 32.5" RCP-PVC

Observations (10)

DistanceCodeObservation
82.5TBActive
134.4MGOConn. @ Mh, 3 O' Clock. Capped
28.1MWM
28.1MGO32.5" RCP-PVC
0AMH3:15AM
0MWL
8MGO32.5" RCP-PVC
134.4MGOConn. @ Mh, 9 O' Clock. OPEN
0MWM
134.8AMH3:20AM

Properties (7)

custom_field_three
PVC LINER
custom_field_two
4
customer
LACSD
datetime
2017-03-22T01:46:55-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false
lining
PVC