21 0292_21 0291_02102021_111619.mp4
3.7 ft. - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
3.7 ft. - General Observation - MAG COATING
11.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
43.4 ft. - Deposits Settled Compacted, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - FALLEN PIPE MATERIAL
71.9 ft. - Water Level, 15 %of cross sectional area - DUE TO BLOCKAGE
87.6 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
101.7 ft. - Obstacles Pipe Material, 20 %of cross sectional area, from 03 to 09 o'clock
102.8 ft. - General Observation - BLOCKAGE BROKEN UP
| Distance | Code | Observation |
|---|---|---|
| 87.6 | SRI | — |
| 0 | AMH | 21 0292 |
| 3.7 | SRI | — |
| 0 | MWM | — |
| 71.9 | MWL | DUE TO BLOCKAGE |
| 0 | MGO | CONNECTION AT MH 9 O'CLOCK |
| 197.7 | SSS | — |
| 43.4 | DSC | FALLEN PIPE MATERIAL |
| 199.5 | AMH | 21 0291 |
| 102.8 | MGO | BLOCKAGE BROKEN UP |
| 101.7 | OBM | — |
| 87.6 | SAV | — |
| 197.7 | SAV | — |
| 0 | MWL | — |
| 197.7 | DSC | — |
| 199.5 | MGO | CONNECTION AT MH 9 O'CLOCK |
| 3.7 | MGO | MAG COATING |
| 11.5 | SSS | — |