Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 2, 2021, 04:37 PM
  • 21 0317_21 0316_02022021_084809.mp4

Date
02/02/2021
W/O
870709
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00763
PipeID
P15512
Time
8:37 AM
Certificate
U-109-7948
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8514
Sewer Name
21 DISTRICT #21 OUTFALL TRUNK
City
POMONA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
14
Purpose
Routine Assessment
Project
RFIR_WO_870709_TV21044_JAN2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
21 0317
Downstream MH
21 0316
Dir. of Survey
Downstream
Length Surveyed
447.1 ft.
Total Length
447.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
4
Pipe schematic from manhole 21 0317 to 21 0316
MH: 21 0317MH: 21 0316downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 21 03170 ft. MWM - Water Mark, 60 %of cross sectional area2 ft. MGO - General Observation - MAG COAT START21.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"315.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"391.5 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"443.4 ft. MGO - General Observation - MAG COAT END447 ft. MGO - General Observation - ROACHES IN D/S MH447.1 ft. AMH - Downstream Manhole, Survey Ends - 21 0316447.1 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observations (11)

DistanceCodeObservation
447MGOROACHES IN D/S MH
315.2TFA
0MWL
447.1AMH21 0316
0AMH21 0317
2MGOMAG COAT START
443.4MGOMAG COAT END
21.4TFA
0MWM
447.1MGOCONNECTION AT MH 3 O'CLOCK
391.5TFA

Properties (7)

additional_info
630138020221061
custom_field_three
LIGHT GREASE
custom_field_two
3
customer
1
datetime
2021-02-02T08:37:09-08:00
documentation
PRO PIPE
is_lateral_inspection
false