Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 5, 2021, 04:09 PM
  • 21 0319B_21 0319A_02052021_081445.mp4

Date
02/05/2021
W/O
870709
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00763
PipeID
P15516
Time
8:09 AM
Certificate
U-109-7948
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8516
Sewer Name
21 DISTRICT #21 OUTFALL TRUNK
City
POMONA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
14
Purpose
Routine Assessment
Project
RFIR_WO_870709_TV21044_JAN2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
21 0319B
Downstream MH
21 0319A
Dir. of Survey
Downstream
Length Surveyed
76.3 ft.
Total Length
76.3 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole 21 0319B to 21 0319A
MH: 21 0319BMH: 21 0319Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - 21 0319B0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK2 ft. MGO - General Observation - MAG COAT START2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start73.5 ft. MGO - General Observation - MAG COAT END73.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish76.3 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK76.3 ft. AMH - Downstream Manhole, Survey Ends - 21 0319A

Observations (10)

DistanceCodeObservation
0AMH21 0319B
2MGOMAG COAT START
76.3MGOCONNECTION AT MH 9 O'CLOCK
73.5MGOMAG COAT END
73.5DAGS
76.3AMH21 0319A
2DAGS
0MWM
0MWL
0MGOCONNECTION AT MH 9 O'CLOCK

Properties (7)

additional_info
630138020521061
custom_field_three
LIGHT GREASE
custom_field_two
3
customer
1
datetime
2021-02-05T08:09:22-08:00
documentation
PRO PIPE
is_lateral_inspection
false