Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 28, 2021, 09:47 AM
  • 05 0499_05 0498_01282021_020638.mp4

Date
01/28/2021
W/O
870604
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00459
PipeID
P05715
Time
1:47 AM
Certificate
U-109-7948
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8511
Sewer Name
05 INGLEWOOD TRUNK #1
City
INGLEWOOD
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
04
Purpose
Routine Assessment
Project
WO_870604_TV05042_JAN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
36 in.
Upstream MH
05 0499
Downstream MH
05 0498
Dir. of Survey
Downstream
Length Surveyed
362.5 ft.
Total Length
362.5 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2M00
O&M Rating
142
Overall Index
2
Overall Quick
Overall Rating
142
Pipe schematic from manhole 05 0499 to 05 0498
MH: 05 0499MH: 05 0498downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 04990 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start359.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish362.5 ft. AMH - Downstream Manhole, Survey Ends - 05 0498

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (6)

DistanceCodeObservation
0AMH05 0499
359.3DAGS
0MWL
2DAGS
0MWM
362.5AMH05 0498

Properties (8)

additional_info
630138012721201
custom_field_three
GREASE
custom_field_two
4
customer
1
datetime
2021-01-28T01:47:31-08:00
documentation
PRO PIPE
is_lateral_inspection
false
lining
CIPP