Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 27, 2021, 10:34 AM
  • 05 0507_05 0506_01272021_024135.mp4

Date
01/27/2021
W/O
870604
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00459
PipeID
P05724
Time
2:34 AM
Certificate
U-109-7948
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8510
Sewer Name
05 INGLEWOOD TRUNK #1
City
INGELWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
04
Purpose
Routine Assessment
Project
WO_870604_TV05042_JAN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
36 in.
Upstream MH
05 0507
Downstream MH
05 0506
Dir. of Survey
Downstream
Length Surveyed
152 ft.
Total Length
152 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2E00
O&M Rating
60
Overall Index
2
Overall Quick
Overall Rating
60
Pipe schematic from manhole 05 0507 to 05 0506
MH: 05 0507MH: 05 0506downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 05070 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start25 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"84.4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN143.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN150 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish152 ft. AMH - Downstream Manhole, Survey Ends - 05 0506

Observations (9)

DistanceCodeObservation
25TFA
150DAGS
143.3TFOPEN
152AMH05 0506
84.4TFOPEN
0MWL
0AMH05 0507
0MWM
2DAGS

Properties (8)

additional_info
SC411898
custom_field_three
GREASE
custom_field_two
4
customer
1
datetime
2021-01-27T02:34:18-08:00
documentation
PRO PIPE
is_lateral_inspection
false
lining
CIPP