Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 28, 2021, 05:48 AM
  • 05 0504_05 0503_01272021_220610.mp4

Date
01/27/2021
W/O
870604
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00459
PipeID
P05721
Time
9:48 PM
Certificate
U-109-7948
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8511
Sewer Name
05 INGLEWOOD TRUNK #1
City
INGLEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
04
Purpose
Routine Assessment
Project
WO_870604_TV05042_JAN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
36 in.
Upstream MH
05 0504
Downstream MH
05 0503
Dir. of Survey
Downstream
Length Surveyed
329.6 ft.
Total Length
329.7 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2L00
O&M Rating
134
Overall Index
2
Overall Quick
Overall Rating
134
Pipe schematic from manhole 05 0504 to 05 0503
MH: 05 0504MH: 05 0503downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 6 O'CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 05 05040 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start102.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN107.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN154.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN194.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4", 4"199.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN221.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN297.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN329 ft. MGO - General Observation - CONN @ MH 12 O'CLOCK/ACTIVE329 ft. MGO - General Observation - ROACHES @ MH329.7 ft. OBZ - Obstacles Other, 5 %of cross sectional area, from 05 to 10 o'clock - METAL BAR329.7 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish329.7 ft. AMH - Downstream Manhole, Survey Ends - 05 0503

Observation photos (2)

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Obstacles Other, 5 %of cross sectional area, from 05 to 10 o'clock - METAL BAR

    329.7 ft. - Obstacles Other, 5 %of cross sectional area, from 05 to 10 o'clock - METAL BAR

Observations (18)

DistanceCodeObservation
0MWL
0MGOCONN @ MH 6 O'CLOCK/ACTIVE
199.3TFOPEN
154.9TFOPEN
194.6TFA
102.2TFOPEN
329MGOCONN @ MH 12 O'CLOCK/ACTIVE
0AMH05 0504
2DAGS
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
221.7TFOPEN
329.7OBZMETAL BAR
329.7DAGS
107.2TFOPEN
329MGOROACHES @ MH
297.2TFOPEN
0MWM
329.7AMH05 0503

Properties (8)

additional_info
630138012721201
custom_field_three
GREASE
custom_field_two
4
customer
1
datetime
2021-01-27T21:48:12-08:00
documentation
PRO PIPE
is_lateral_inspection
false
lining
CIPP