Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 5, 2021, 11:06 AM
  • 22 0254_22 0253_02052021_032259.mp4

Date
02/05/2021
W/O
870562
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16536
Time
3:06 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8392
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_870562_TV22016_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0254
Downstream MH
22 0253
Dir. of Survey
Downstream
Length Surveyed
275.7 ft.
Total Length
275.7 ft.
Structural Index
3
Structural Quick
3J2J
Structural Rating
270
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
270
Pipe schematic from manhole 22 0254 to 22 0253
MH: 22 0254MH: 22 0253downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 02540 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK0 ft. MWM - Water Mark, 35 %of cross sectional area2.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.6 ft. MGO - General Observation - MAG COAT4.2 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"7.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"41.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"77.8 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"80.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"154.4 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"156.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"205.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"207.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"273.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish273.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish275.7 ft. AMH - Downstream Manhole, Survey Ends - 22 0253275.7 ft. MGO - General Observation - CONNECTION AT MH, 3 AND 9 O'CLOCK

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2.6 ft. - General Observation - MAG COAT

Observations (20)

DistanceCodeObservation
273.7SAP
77.8TF
4.2TF
80.5TFC
0AMH22 0254
275.7AMH22 0253
275.7MGOCONNECTION AT MH, 3 AND 9 O'CLOCK
207.6TFC
41.8TFC
2.6SSS
154.4TF
0MWL
2.6SAP
156.4TFC
0MGOCONNECTION AT MH, 9 O'CLOCK
7.4TFC
205.6TF
0MWM
273.7SSS
2.6MGOMAG COAT

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2021-02-05T03:06:36-08:00
documentation
PRO PIPE
is_lateral_inspection
false