Wastewater/Activity/PacpInspection/1.0Feb 9, 2021, 06:38 AM
  • 22 0249_22 0248_02082021_225406.mp4

Date
02/08/2021
W/O
870562
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16531
Time
10:38 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8397
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_870562_TV22016_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0249
Downstream MH
22 0248
Dir. of Survey
Downstream
Length Surveyed
292.9 ft.
Total Length
292.9 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
290
O&M Index
3
O&M Quick
3200
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
296
Pipe schematic from manhole 22 0249 to 22 0248
MH: 22 0249MH: 22 0248downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02490 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK2.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start15 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"24.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"69.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"81.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"81.6 ft. RML - Roots Medium Lateral, from 03 to 09 o'clock, 15 %, within 8 inches of joint: YES114.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"159.9 ft. RML - Roots Medium Lateral, from 07 to 08 o'clock, 10 %, within 8 inches of joint: YES159.9 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"162.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"213.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"258.9 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"268.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"290.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish290.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish292.9 ft. AMH - Downstream Manhole, Survey Ends - 22 0248

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Medium Lateral, from 03 to 09 o'clock, 15 %, within 8 inches of joint: YES

    81.6 ft. - Roots Medium Lateral, from 03 to 09 o'clock, 15 %, within 8 inches of joint: YES

  • Roots Medium Lateral, from 07 to 08 o'clock, 10 %, within 8 inches of joint: YES

    159.9 ft. - Roots Medium Lateral, from 07 to 08 o'clock, 10 %, within 8 inches of joint: YES

Observations (21)

DistanceCodeObservation
81.6TF
24.1TFC
292.9AMH22 0248
290.6SSS
268.2TFC
0MWM
159.9RML
2.4SAP
0AMH22 0249
69.2TFC
81.6RML
0MWL
114.6TFC
159.9TF
213.6TFC
290.6SAP
162.7TFC
2.4SSS
15TFC
0MGOCONNECTION AT MH, 3 O'CLOCK
258.9TF

Properties (6)

custom_field_three
AGGREGATE PROJECTING,SPALLING
custom_field_two
3
customer
1
datetime
2021-02-08T22:38:46-08:00
documentation
PRO PIPE
is_lateral_inspection
false