Wastewater/Activity/PacpInspection/1.0Feb 9, 2021, 10:21 AM
  • 22 0245_22 0244_02092021_023336.mp4

Date
02/09/2021
W/O
870562
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16527
Time
2:21 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8397
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_870562_TV22016_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0244
Downstream MH
22 0245
Dir. of Survey
Upstream
Length Surveyed
223.4 ft.
Total Length
223.4 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
220
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
220
Pipe schematic from manhole 22 0244 to 22 0245
MH: 22 0244MH: 22 0245upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 02452.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish34.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"48.5 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"52.5 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"82.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"119.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"162.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"174.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"213.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"221.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start221.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start221.4 ft. MGO - General Observation - MAG COAT223.4 ft. MWL - Water Level, 15 %of cross sectional area223.4 ft. MWM - Water Mark, 35 %of cross sectional area223.4 ft. AMH - Downstream Manhole, Survey Begins - 22 0244

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

    170.9 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

Observations (17)

DistanceCodeObservation
141TFC
170.9TB
61.1TFC
223.4AMH22 0245
2SAP
174.9TFC
189.3TFC
0MWL
2SSS
0MWM
2MGOMAG COAT
0AMH22 0244
10.1TFC
49.1TFC
220.6SAP
104.1TFC
220.5SSS

Properties (6)

custom_field_three
AGGREGATE PROJECTING,SPALLING
custom_field_two
3
customer
1
datetime
2021-02-09T02:21:21-08:00
documentation