Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 9, 2021, 09:17 AM
  • 22 0242_22 0241_02092021_014304.mp4

Date
02/09/2021
W/O
870562
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16524
Time
1:17 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8397
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_870562_TV22016_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0242
Downstream MH
22 0241
Dir. of Survey
Downstream
Length Surveyed
395.7 ft.
Total Length
395.7 ft.
Structural Index
3
Structural Quick
3O2O
Structural Rating
390
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
390
Pipe schematic from manhole 22 0242 to 22 0241
MH: 22 0242MH: 22 0241downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02420 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK2.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.4 ft. MGO - General Observation - MAG COAT26.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"54.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"84.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"124.6 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"139.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"172.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"197.8 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"215.5 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"252.2 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"273.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"295.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"322 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"346.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"392.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish392.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish395.7 ft. AMH - Downstream Manhole, Survey Ends - 22 0241395.7 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2.4 ft. - General Observation - MAG COAT

Observations (24)

DistanceCodeObservation
124.6TF
0MWM
295.1TFC
0AMH22 0242
54.2TFC
84.7TFC
197.8TFC
139.7TFC
392.8SSS
2.4SSS
392.8SAP
346.2TFC
322TF
2.4SAP
395.7AMH22 0241
252.2TF
2.4MGOMAG COAT
0MWL
172.7TFC
26.7TFC
215.5TF
395.7MGOCONNECTION AT MH, 3 O'CLOCK
273.3TFC
0MGOCONNECTION AT MH, 9 O'CLOCK

Properties (6)

custom_field_three
AGGREGATE PROJECTING,SPALLING
custom_field_two
3
customer
1
datetime
2021-02-09T01:17:40-08:00
documentation
PRO PIPE
is_lateral_inspection
false