Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 4, 2021, 07:31 AM
  • 22 0272_22 0271_02032021_234432.mp4

Date
02/03/2021
W/O
870562
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16557
Time
11:31 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8390
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_870562_TV22016_JAN2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0271
Downstream MH
22 0272
Dir. of Survey
Upstream
Length Surveyed
257.1 ft.
Total Length
257.1 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole 22 0271 to 22 0272
MH: 22 0271MH: 22 0272upstream0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. LL - Alignment Left, 20 %, Finish0 ft. AMH - Downstream Manhole, Survey Ends - 22 02720 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish16.1 ft. LL - Alignment Left, 20 %, Start26 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"49.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"73.2 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"97.5 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"121.2 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: YES, 8"176.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"200.5 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"223.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"255.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start255.1 ft. MGO - General Observation - MAG COAT255.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start257.1 ft. MWM - Water Mark, 35 %of cross sectional area257.1 ft. AMH - Downstream Manhole, Survey Begins - 22 0271257.1 ft. MWL - Water Level, 20 %of cross sectional area257.1 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Alignment Left, 20 %, Start

    241 ft. - Alignment Left, 20 %, Start

Observations (20)

DistanceCodeObservation
257.1SSS
257.1LL
231.1TFC
257.1AMH22 0272
207.5TFC
2SSS
0MWM
56.6TF
159.6TF
0AMH22 0271
0MWL
135.9TFA
2MGOMAG COAT
2SAP
33.3TFC
183.9TF
257.1SAP
80.3TFC
0MGOCONNECTION AT MH 9 O'CLOCK
241LL

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2021-02-03T23:31:30-08:00
documentation
PRO PIPE
is_lateral_inspection
false