Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 4, 2021, 08:47 AM
  • 22 1388_22 0268_02042021_005720.mp4

Date
02/04/2021
W/O
870562
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16553
Time
12:47 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8390
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_870562_TV22016_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0268
Downstream MH
22 1388
Dir. of Survey
Upstream
Length Surveyed
44.3 ft.
Total Length
44.3 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
3
O&M Quick
3100
O&M Rating
3
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole 22 0268 to 22 1388
MH: 22 0268MH: 22 1388upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 13880 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0.9 ft. DSF - Deposits Settled Fine, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish0.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish42.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start42.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start42.3 ft. DSF - Deposits Settled Fine, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start42.3 ft. MGO - General Observation - MAG COAT44.3 ft. AMH - Downstream Manhole, Survey Begins - 22 026844.3 ft. MWL - Water Level, 10 %of cross sectional area44.3 ft. MWM - Water Mark, 35 %of cross sectional area44.3 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Fine,  15 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Settled Fine, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

Observations (13)

DistanceCodeObservation
2SAP
0AMH22 0268
43.4DSF
0MWL
2SSS
43.4SSS
44.3AMH22 1388
44.3MGOCONNECTION AT MH 3 O'CLOCK
0MWM
2DSF
43.4SAP
2MGOMAG COAT
0MGOCONNECTION AT MH 3 O'CLOCK

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2021-02-04T00:47:51-08:00
documentation
PRO PIPE
is_lateral_inspection
false