Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 4, 2021, 10:44 AM
  • 22 0265_22 0264_02042021_030714.mp4

Date
02/04/2021
W/O
870562
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16548
Time
2:44 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8390
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_870562_TV22016_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0265
Downstream MH
22 0264
Dir. of Survey
Downstream
Length Surveyed
436.3 ft.
Total Length
436.3 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole 22 0265 to 22 0264
MH: 22 0265MH: 22 0264downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02652 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start11 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"50.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"58.6 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"102.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start106.5 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"110.5 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"140.1 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"142.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"158.5 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"206.6 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"214.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"247.7 ft. TBI - Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: YES, 8", 2"258.5 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"306.5 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"314.6 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"358.4 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"378.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"406.6 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"432.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish432.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish432.7 ft. MMC - Material Change, Vitrified clay pipe436.3 ft. AMH - Downstream Manhole, Survey Ends - 22 0264436.3 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (5)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    102.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"

    140.1 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"

  • Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: YES, 8", 2"

    247.7 ft. - Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: YES, 8", 2"

  • Material Change, Vitrified clay pipe

    432.7 ft. - Material Change, Vitrified clay pipe

Observations (27)

DistanceCodeObservation
106.5TFC
102.5SSS
142.7TFC
11TF
2SAP
436.3AMH22 0264
0MWL
50.7TFC
358.4TF
314.6TF
58.6TFC
436.3MGOCONNECTION AT MH 9 O'CLOCK
247.7TBI
140.1TB
206.6TFC
158.5TFC
306.5TFC
110.5TF
378.4TFC
0MWM
406.6TFC
258.5TFC
214.3TFC
432.7SAP
432.7SSS
432.7MMC
0AMH22 0265

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2021-02-04T02:44:50-08:00
documentation
PRO PIPE
is_lateral_inspection
false