Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 5, 2021, 10:08 AM
  • 22 0263_22 0262_02052021_021855.mp4

Date
02/05/2021
W/O
870562
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16545
Time
2:08 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8392
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_870562_TV22016_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0262
Downstream MH
22 0263
Dir. of Survey
Upstream
Length Surveyed
252.8 ft.
Total Length
252.8 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
250
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
250
Pipe schematic from manhole 22 0262 to 22 0263
MH: 22 0262MH: 22 0263upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 02630.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish10.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"53.5 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"62.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"111.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"156.9 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"159.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"209.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"250.4 ft. MGO - General Observation - MAG COAT250.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start250.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start252.8 ft. AMH - Downstream Manhole, Survey Begins - 22 0262252.8 ft. MWL - Water Level, 10 %of cross sectional area252.8 ft. MWM - Water Mark, 35 %of cross sectional area252.8 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK

Observation photos (3)

  • General Observation - MAG COAT

    2.4 ft. - General Observation - MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
199.3TF
190.6TFC
252.6SAP
242.2TFC
141.4TFC
252.6SSS
2.4MGOMAG COAT
43.6TFC
0AMH22 0262
93.5TFC
2.4SSS
252.8AMH22 0263
0MWL
2.4SAP
95.9TFC
0MWM
0MGOCONNECTION AT MH, 3 O'CLOCK

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2021-02-05T02:08:06-08:00
documentation
PRO PIPE
is_lateral_inspection
false