Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 5, 2021, 09:52 AM
  • 22 0262_22 0261_02052021_020537.mp4

Date
02/05/2021
W/O
870562
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16544
Time
1:52 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8392
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_870562_TV22016_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0261
Downstream MH
22 0262
Dir. of Survey
Upstream
Length Surveyed
316 ft.
Total Length
316 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
315
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
315
Pipe schematic from manhole 22 0261 to 22 0262
MH: 22 0261MH: 22 0262upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 02620 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK0.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish11.3 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"60.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"105.9 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"107.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"160.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"212.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"230.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"261 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"314 ft. MGO - General Observation - MAG COAT314 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start314 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start316 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK316 ft. MWM - Water Mark, 35 %of cross sectional area316 ft. AMH - Downstream Manhole, Survey Begins - 22 0261316 ft. MWL - Water Level, 10 %of cross sectional area

Observation photos (3)

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
2MGOMAG COAT
0MGOCONNECTION AT MH, 3 O'CLOCK
210.1TFC
316AMH22 0262
208.6TFC
315.2SSS
0MWM
85.8TFC
0AMH22 0261
255.4TFC
304.7TF
315.2SAP
316MGOCONNECTION AT MH, 3 O'CLOCK
2SAP
103.6TFC
55TFC
0MWL
2SSS
155.6TFC

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2021-02-05T01:52:00-08:00
documentation
PRO PIPE
is_lateral_inspection
false