Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 5, 2021, 07:56 AM
  • 22 0261_22 0260_02052021_001641.mp4

Date
02/04/2021
W/O
870562
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16543
Time
11:56 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8392
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_870562_TV22016_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0261
Downstream MH
22 0260
Dir. of Survey
Downstream
Length Surveyed
322.3 ft.
Total Length
322.3 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
320
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
320
Pipe schematic from manhole 22 0261 to 22 0260
MH: 22 0261MH: 22 0260downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02610 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT45.8 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"90.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"94.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"143.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"197.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"243.9 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"245.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"294.6 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"320.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish320.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish322.3 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK CAPPED322.3 ft. AMH - Downstream Manhole, Survey Ends - 22 0260

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

Observations (19)

DistanceCodeObservation
2SSS
197.3TFC
45.8TF
143.1TFC
322.3MGOCONNECTION AT MH, 9 O'CLOCK CAPPED
0MWM
94.7TFC
90.9TFC
0AMH22 0261
320.2SAP
245.7TFC
0MWL
2SAP
320.2SSS
294.6TFC
243.9TF
0MGOCONNECTION AT MH, 9 O'CLOCK
322.3AMH22 0260
2MGOMAG COAT

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2021-02-04T23:56:57-08:00
documentation
PRO PIPE
is_lateral_inspection
false