Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 5, 2021, 08:18 AM
  • 22 0260_22 0259_02052021_003259.mp4

Date
02/05/2021
W/O
870562
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16542
Time
12:18 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8392
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_870562_TV22016_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0260
Downstream MH
22 0259
Dir. of Survey
Downstream
Length Surveyed
184 ft.
Total Length
184 ft.
Structural Index
3
Structural Quick
3F2F
Structural Rating
180
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
180
Pipe schematic from manhole 22 0260 to 22 0259
MH: 22 0260MH: 22 0259downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK CAPPED0 ft. AMH - Upstream Manhole, Survey Begins - 22 02600 ft. MWM - Water Mark, 35 %of cross sectional area2.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.8 ft. MGO - General Observation - MAG COAT30.6 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"73.6 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"115.4 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"125.9 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"181.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish181.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish184 ft. AMH - Downstream Manhole, Survey Ends - 22 0259184 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    4.8 ft. - General Observation - MAG COAT

Observations (15)

DistanceCodeObservation
2.9SSS
125.9TFC
4.8MGOMAG COAT
0MWL
184AMH22 0259
115.4TF
73.6TFC
0MGOCONNECTION AT MH, 9 O'CLOCK CAPPED
184MGOCONNECTION AT MH, 3 O'CLOCK
0AMH22 0260
181.3SAP
181.3SSS
30.6TFC
2.8SAP
0MWM

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2021-02-05T00:18:40-08:00
documentation
PRO PIPE
is_lateral_inspection
false