Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 5, 2021, 08:34 AM
  • 22 0259_22 0258_02052021_004530.mp4

Date
02/05/2021
W/O
870562
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16541
Time
12:34 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8392
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_870562_TV22016_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0259
Downstream MH
22 0258
Dir. of Survey
Downstream
Length Surveyed
148.4 ft.
Total Length
148.4 ft.
Structural Index
3
Structural Quick
3E2E
Structural Rating
145
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
145
Pipe schematic from manhole 22 0259 to 22 0258
MH: 22 0259MH: 22 0258downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 02590 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. MGO - General Observation - MAG COAT23.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"66.7 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"68.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"120.8 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"124.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"146.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish146.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish148.4 ft. AMH - Downstream Manhole, Survey Ends - 22 0258148.4 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2.1 ft. - General Observation - MAG COAT

Observations (16)

DistanceCodeObservation
148.4AMH22 0258
66.7TF
146.9SSS
124.1TFC
120.8TF
0AMH22 0259
23.6TFC
2.1SAP
2.1SSS
146.9SAP
0MGOCONNECTION AT MH, 3 O'CLOCK
0MWL
148.4MGOCONNECTION AT MH, 9 O'CLOCK
68.9TFC
0MWM
2.1MGOMAG COAT

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2021-02-05T00:34:16-08:00
documentation
PRO PIPE
is_lateral_inspection
false