Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 3, 2021, 07:12 AM
  • A 0841_A 0840_02022021_233552.mp4

Date
02/02/2021
W/O
870569
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00324
PipeID
P08181
Time
11:12 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8464
Sewer Name
A JOA-1A NORTH LONG BEACH INTERCEPTOR
City
LAKEWOOD
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
08
Purpose
Routine Assessment
Project
WO_870569_TV03038_JAN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
30 in.
Width
39 in.
Upstream MH
A 0841
Downstream MH
A 0840
Dir. of Survey
Downstream
Length Surveyed
616.6 ft.
Total Length
616.6 ft.
Structural Index
2
Structural Quick
2200
Structural Rating
4
O&M Index
2
O&M Quick
2W00
O&M Rating
244
Overall Index
2
Overall Quick
Overall Rating
248
Pipe schematic from manhole A 0841 to A 0840
MH: A 0841MH: A 0840downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - A 08410.1 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start614 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish614 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish616.6 ft. AMH - Downstream Manhole, Survey Ends - A 0840

Observations (10)

DistanceCodeObservation
614DAGS
2DAGS
0MWL
614SSS
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
2SSS
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
0AMHA 0841
616.6AMHA 0840
0.1MWM

Properties (7)

additional_info
630074020221201
custom_field_three
SPALLING
custom_field_two
3
customer
1
datetime
2021-02-02T23:12:40-08:00
documentation
PROPIPE
is_lateral_inspection
false