29 0739_29 0738_02012021_053951.mp4
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
37.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
37.2 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
50.6 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"
196.6 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"
315.6 ft. - Material Change, Vitrified clay pipe
| Distance | Code | Observation |
|---|---|---|
| 68.6 | TF | — |
| 315.6 | FM | — |
| 167.9 | TF | — |
| 319.1 | AMH | 29 0738 |
| 315.6 | MMC | — |
| 2 | DAGS | — |
| 0 | AMH | 29 0739 |
| 114.3 | TF | — |
| 238.8 | TF | — |
| 297 | TF | — |
| 37.2 | SAP | — |
| 269.3 | TF | — |
| 0 | MWM | — |
| 127.1 | TF | — |
| 37.2 | FM | — |
| 180.4 | TF | — |
| 0 | MGO | CONNECTION AT THE MH 3 OC'LOCK |
| 315.6 | DAGS | — |
| 315.3 | TF | — |
| 196.6 | TB | — |
| 50.6 | TB | — |
| 215.9 | TF | — |
| 315.6 | SAP | — |
| 0 | MWL | — |