Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 1, 2021, 01:21 PM
  • 29 0739_29 0738_02012021_053951.mp4

Date
02/01/2021
W/O
870407
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00527
PipeID
P24245
Time
5:21 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8385
Sewer Name
29 ALAMITOS PUMPING PLANT TRUNK
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_870407_TV29078_JAN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0739
Downstream MH
29 0738
Dir. of Survey
Downstream
Length Surveyed
319.1 ft.
Total Length
319.1 ft.
Structural Index
4
Structural Quick
4J3J
Structural Rating
392
O&M Index
2
O&M Quick
2L00
O&M Rating
126
Overall Index
3
Overall Quick
Overall Rating
518
Pipe schematic from manhole 29 0739 to 29 0738
MH: 29 0739MH: 29 0738downstream0 ft. AMH - Upstream Manhole, Survey Begins - 29 07390 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start37.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start37.2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start50.6 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"68.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"114.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"127.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"167.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"180.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"196.6 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"215.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"238.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"269.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"297 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"315.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"315.6 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish315.6 ft. MMC - Material Change, Vitrified clay pipe315.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish315.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish319.1 ft. AMH - Downstream Manhole, Survey Ends - 29 0738

Observation photos (6)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    37.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    37.2 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

    50.6 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

    196.6 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

  • Material Change, Vitrified clay pipe

    315.6 ft. - Material Change, Vitrified clay pipe

Observations (24)

DistanceCodeObservation
68.6TF
315.6FM
167.9TF
319.1AMH29 0738
315.6MMC
2DAGS
0AMH29 0739
114.3TF
238.8TF
297TF
37.2SAP
269.3TF
0MWM
127.1TF
37.2FM
180.4TF
0MGOCONNECTION AT THE MH 3 OC'LOCK
315.6DAGS
315.3TF
196.6TB
50.6TB
215.9TF
315.6SAP
0MWL

Properties (6)

custom_field_three
AGGREGATE PROJECTING, FRACTURES
custom_field_two
2
customer
1
datetime
2021-02-01T05:21:44-08:00
documentation
PRO PIPE
is_lateral_inspection
false