Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 5, 2021, 05:52 PM
  • A 0204_A 0203_352021_111625.mp4

Date
03/05/2021
W/O
0875126
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00323
PipeID
P08140
Time
9:52 AM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1740
Sewer Name
A JOA-1A LOS COYOTES WRP INTERCEPTOR
City
SOUTH GATE
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
29
Purpose
Capital Improvement Program Assesment
Project
20210305SHO_JOA1A_LOS_COYOTES_WRP_INTERCEPTOR
Material
Reinforced Concrete Pipe
Shape
Circular
Height
75 in.
Upstream MH
A 0204
Downstream MH
A 0203
Dir. of Survey
Downstream
Length Surveyed
1043.8 ft.
Total Length
1043.8 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole A 0204 to A 0203
MH: A 0204MH: A 0203downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - MH 20412 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start12 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start12 ft. MGO - General Observation - 90% MAG COAT INTACT1042.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1042.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish1043.8 ft. AMH - Downstream Manhole, Survey Ends - MH 203

Observations (9)

DistanceCodeObservation
1043.8AMHMH 203
0MWL
0MWM
0AMHMH 204
1042.8SAV
12SSS
12SAV
12MGO90% MAG COAT INTACT
1042.8SSS

Properties (7)

additional_info
RFIR
custom_field_two
3
customer
LACSD
datetime
2021-03-05T09:52:01-08:00
documentation
OBREGON, SHADLER, BRAR, RAMIREZ
is_lateral_inspection
false
year_laid
19780526