Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 3, 2021, 12:39 PM
  • F 0219_F 0218_332021_044107.mp4

Date
03/03/2021
W/O
0875105
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00050
PipeID
P10349
Time
4:39 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1738
Sewer Name
F JOINT OUTFALL F - UNIT 7H
City
CERRITOS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
38
Purpose
Routine Assessment
Project
20210303MDM_JOINT_OUTFALL_UNIT_7H
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
F 0219
Downstream MH
F 0218
Dir. of Survey
Downstream
Length Surveyed
337.9 ft.
Total Length
337.9 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole F 0219 to F 0218
MH: F 0219MH: F 0218downstream0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:40AM2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC24.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped97.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG118.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - CAPPED220.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped314.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped337.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE337.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG337.4 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active337.9 ft. AMH - Downstream Manhole, Survey Ends - 5:00AM

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    0 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    97.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

Observations (14)

DistanceCodeObservation
314.9TFCCapped
0SSSBLISTERING PEELING CONCRETE
0MWM
2SAPSEVERE AGG SPORATIC
0MWL
97.8SAPSEVERE AGG
0AMH4:40AM
24.1TFCCapped
337.4SSSBLISTERING PEELING CONCRETE
337.9AMH5:00AM
337.4SAPSEVERE AGG
118.8TFCCAPPED
337.4MGOConn. @ Mh, 9 O' Clock. Active
220.4TFCCapped

Properties (6)

custom_field_three
SEVERE AGG PROJECTING SPORATIC
custom_field_two
3
customer
LACSD
datetime
2021-03-03T04:39:34-08:00
documentation
MARTIN,OLIVER 111,CASTILLO,RUVALCABA
is_lateral_inspection
false